HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 6 of 128
5.10. Close the door of the Power Cabinet 81
5.11. Unpack the Charge control set 82
5.11.1. Before unpacking 82
5.11.2. Remove packaging 83
5.12. Move the ABB pole to position 83
5.13. Install vertical frame onto the foundation 84
5.14. Install horizontal frame onto the vertical frame 86
5.15. Connect GND wires to ABB Pole 89
5.15.1. Connect the GND wire of the ACS GND 89
5.15.2. Connect the GND wire from the horizontal frame 89
5.15.3. Connect the GND wire from the Junction Box 90
5.15.4. Connect the GND wire of the Power Cabinet 90
5.15.5. Install lighting protection 91
5.16. Connect cables ACS Control Module 91
5.16.1. Gland layout of the ACS Control Module 92
5.16.2. Open the door of the ACS Control Module 92
5.16.3. Connect the DC+ power in- and output cables 93
5.16.4. Connect the DC- power in- and output cables in Junction Box 95
5.16.5. Connect the AC utility power cable from Power Cabinet 97
5.16.6. Connect the communication cable from the Power Cabinet 97
5.16.7. Connect the WiFi cable 99
5.16.8. Connect the RFID cables 99
5.16.9. Connect the other cables to the ACS Control Module 101
5.17. Close the door of the ACS Control Module 102
5.18. Install masks plate work 103
5.19. Grouting of the pole construction 108
6. Commissioning 109
6.1. Commissioning preparation 109
6.2. Customer Acceptance Form (CAF) 110
7. Service and Maintenance 111
7.1. About Service and Maintenance 111
7.2. Cleaning of the cabinet 111
8. Technical Specification 112
8.1. Electrical specification complete system 112
8.2. Mechanical data 112
8.3. Environment 113
8.4. Certifications 113
9. Appendix 114
A Dimensions Power Cabinet 115
B Dimensions ACS Control Module 117
C Dimensions Junction Box 118
D Dimensions ABB Pole 119
E Dimensions Concrete Foundation Power Cabinet 121
F Dimensions Metal Foundation Power Cabinet 123
G Dimensions pre-fabricated Concrete Foundation Pole 124
H Power Cabinet – Outline with Foundation 125
I Signal connection diagram 126
J Ground overview of the system 127
Glossary