EasyManua.ls Logo

ABB IRB 2600 - Page 340

ABB IRB 2600
396 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteEquipment
M8 (2 pcs)Guide pins
Used to guide the gearbox during removal/re-
fitting.
Content is defined in section Standard tools
on page 383.
Standard toolkit
These procedures include references to the
tools required.
Other tools and procedures may be re-
quired. See references to these procedures
in the step-by-step instructions below.
Removing gearbox axis 1
Use this procedure to remove the gearbox.
NoteAction
How to drain the oil from the gearbox is
described in section:
Changing the oil, axis 1 gearbox
on floor mounted robots on
page 153
Drain the oil from the gearbox.1
Move the robot to the calibration position.2
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
3
See Removing motors on page 286.Remove the axis 1 motor.4
How to remove the base from the com-
plete arm system is described in section:
Removing the base on page 243
In order to reach gearbox axis 1, it is neces-
sary first to remove the base from the com-
plete arm system.
5
Continues on next page
340 Product manual - IRB 2600
3HAC035504-001 Revision: G
© Copyright 2009-2015 ABB. All rights reserved.
4 Repair
4.8.1 Replacing gearbox axis 1
Continued

Table of Contents

Related product manuals