EasyManua.ls Logo

ABB LGR GLA351 Series - Page 113

ABB LGR GLA351 Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER MANUAL | ICOS | INSTRUCTIONS | UM/ICOS-EN REV. B.2
113
Hardware Setup
Setup the External Connections:
1. Connect the External Pump:
a. Connect the pump’s power cord from the pump to the
EXT. PUMP POWER
port on the back panel of the analyzer.
b. Connect the provided 6’ x 3/8” Teflon tubing with Swagelok fittings from
the external pump to the
TO EXT PUMP
port on the back panel of the
analyzer.
c. Connect the provided exhaust muffler to the exhaust port of the pump to
exhaust into the room air, or route to your facility ventilation system.
2. Connect your Zero-Air source to the ¼” Swagelok Zero-Air Inlet port on the back
panel of the analyzer. (Figure 106)
a. Zero-Air flow should be set between 5 and 10 psig.
Figure 106: External Batch Connections for a 911 Series Analyzer

Table of Contents

Related product manuals