EasyManua.ls Logo

ABB RER670 - Page 297

ABB RER670
506 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
L
o
a
d
T
a
p
C
h
a
n
g
e
r
raise,lower
signals/alarms
position
BOM
MIM
IED
IL1,IL2,IL3
TRM
3ph or ph-ph or 1ph Current
High Voltage Side
(Load Current) IL
Low Voltage Side
Line Impedance R+jX
U
B
(Busbar Voltage)
Load Center
UL (Load Point Voltage)
IEC10000044-2-en.vsd
BIM
3ph or ph-ph or 1ph Voltage
IEC10000044 V2 EN-US
Figure 123: Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the
three-phase over current protection that blocks the load tap changer in case of over-
current above harmful levels.
The voltage measurement on the LV-side can be made single phase-earth.
However, it shall be remembered that this can only be used in solidly earthed
systems, as the measured phase-earth voltage can increase with as much as a factor
√3 in case of earth faults in a non-solidly earthed system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated U
B
, the load current I
L
and
load point voltage U
L
.
Automatic voltage control for a single transformer
SEMOD159053-73 v6
Automatic voltage control for tap changer, single control TR1ATCC measures the
magnitude of the busbar voltage U
B
. If no other additional features are enabled
(line voltage drop compensation), this voltage is further used for voltage
regulation.
1MRK 506 375-UEN A Section 12
Control
Railway application RER670 2.2 IEC 291
Application manual

Table of Contents

Other manuals for ABB RER670

Related product manuals