1100 Series DAD and MWD User Manual 135
Maintenance 8
Next steps:
13
Reconnect the capillaries, see “Exchanging a Flow Cell” on page 121.
14 Perform a leak test.
15 Insert the flow cell.
16 Replace the front cover.
17 Perform a “Wavelength Verification and Recalibration” or “Holmium Oxide Test” as described in the Service Manual to
check the correct positioning of the flow cell.