EasyManua.ls Logo

Agilent Technologies 7200 - Maintenance Preparation and Safety

Agilent Technologies 7200
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
106 Operation Manual
6 General Maintenance
Before Starting
Before Starting
You can perform much of the maintenance required by your MS.
For your safety, read all of the information in this introduction
before performing any maintenance tasks.
Scheduled maintenance
Common maintenance tasks are listed in Table 9. Performing
these tasks when scheduled can reduce operating problems,
prolong system life, and reduce overall operating costs.
Keep a record of system performance (tune reports) and
maintenance operations performed. This makes it easier to
identify variations from normal operation and to take
corrective action.
Table 9 Maintenance schedule
Task Every week Every 6 months Every year As needed
Tune the MS X
Check the foreline pump oil level X
Check the calibration vial(s) X
Replace the foreline pump oil
*
X
Check the foreline pump X
Clean the ion source X
Check the carrier gas trap(s) on the GC and MS X
Replace the worn out parts X
Check gasket on RIS probe X
Check the IRM vial X
Replace GC gas supplies X
* Or as needed.

Table of Contents

Other manuals for Agilent Technologies 7200

Related product manuals