54 Agilent 8453 Dissolution Testing System Installing and Operating Manual
2Setting Up
Installing Your Multibath System
To install the multibath sampling system for two baths (G1129A) you will need
the following parts:
• Multicell transport
• Flow cell, 1 mm path length (2)
• Valve-pump controller
• Eight-port valve unit (2)
• Peristaltic pump 1VS (2)
• Controller–GPIO cable
• Controller-–valve cable (2)
• Controller–pump cable (2)
• Dissolution probe kit (2)
• Valve tubing kit (2)
• Pump tubing (2)
• Filter tips (2)
Installing Your Multicell Transport
For details, see Installing and Operating Your Eight-position Multicell
Transport manual.