62 Agilent 8453 Dissolution Testing System Installing and Operating Manual
2Setting Up
Installing Your Multibath System
Installing Your Peristaltic Pump 1VS
Each peristaltic pump 1VS is identified by a serial number on a label at the
rear. Write down the serial numbers of your pumps here:
1.)__________________________________________________________________
2.)__________________________________________________________________
3.)__________________________________________________________________
4.)__________________________________________________________________
Installing each pump comprises three stages:
• “Stage 1: Installing the Cables” on page 62,
• “Stage 2: Installing the Pump Tubing” on page 63, and
• “Stage 3: Installing the Tubing Cassette” on page 64.
Stage 1: Installing the Cables
The voltage selector and cable connectors are at the rear panel.
1 Set the correct voltage option (115 V or 230 V) for operation from your line
power supply.
2 Check the correct fuse is installed.
3 Push connector of power cord into line-power socket.
Make sure line-power cord is disconnected before changing line-voltage setting.