64 Agilent 8453 Dissolution Testing System Installing and Operating Manual
2Setting Up
Installing Your Multibath System
Stage 3: Installing the Tubing Cassette
1 Put the tubing cassette on the pressure-wheel assembly by placing the
cassette on the mounting pivot, see Figure 25).
2 Press the cassette down to lock the right side onto the locking-bar.
More detailed information on using the pump can be found in Chapter 3,
“Using the Peristaltic Pumps 1VS and 8VS”.
Figure 25 Placing Tubing-Cassette
Figure 26 Tubing-Cassette in Position