Agilent 8453 Dissolution Testing System Installing and Operating Manual 55
Setting Up 2
Installing Your Multibath System
Setting Up Your Valve-pump Controller
Place the valve-pump controller on a bench, allowing adequate space at rear
for access to connectors.
Each valve-pump controller is identified by a 10-digit serial number on a label
attached to the base. Write the serial number of the valve-pump controller
here:
_____________________________________________________________________
Make sure line-power cord is disconnected.
Figure 19 Front View of Valve-Pump Controller
Line power switch
Status lamps for
pumps