EasyManuals Logo

Agilent Technologies PL-GPC 220 User Manual

Agilent Technologies PL-GPC 220
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
PL-GPC 220 User Manual 45
Using the Module
4
Setting Up the PL-GPC 220
Setting Up the PL-GPC 220
Starting the Instrument
1 Switch on the solvent delivery module and wait until the alarm stops
sounding.
2 Ensure a capped vial is placed in the carousel before powering up the
instrument and the carousel is pushed fully in.
3 Switch on the main unit.
Again the beep will sound while the system initializes.
During the initialization process, the instrument will perform the following
tests:
Test the buzzer
Initialize the pump
Initialize the oven
Initialize the autosampler
Find zero vial
Raise vial into the oven
Purge the syringe
Lower the vial
Reset the syringe to the mid position
Toggle the injection valve 3 times
When the inialization process has completed, the instrument should be left
in the STANDBY (red light) mode with the pump and heaters off.
4 Launch the PL-GPC 220 Control software from the control PC.
5 Replace the columns by a barrel connector.
NOTE
When the instrument is first installed, this alarm may sound for up to 2 min while the vapor
sensor heats up.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies PL-GPC 220 and is the answer not in the manual?

Agilent Technologies PL-GPC 220 Specifications

General IconGeneral
BrandAgilent Technologies
ModelPL-GPC 220
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals