EasyManuals Logo

Agilent Technologies PL-GPC 220 User Manual

Agilent Technologies PL-GPC 220
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
58 PL-GPC 220 User Manual
5 Troubleshooting and Diagnostics
General Troubleshooting Guide
General Troubleshooting Guide
Boot Up Problems
No power
If power indicators, power switch or display panel are not illuminated,
check the fuses at the rear of the control drawer.
Fails to initialize pump
Check that the pump power switch is turned on.
Check the power cable is securely fitted to the rear of the pump.
Check the pump serial link is connected correctly to both the rear of the
pump and the back of the PL-GPC 220 Control drawer.
Injection valve failure
Check that the Link cables on the rear of the Control drawer are
connected correctly.
If problem persists please contact your local Agilent service
representative.
Autosampler general error
Observe initialization sequence for autosampler:
Lower vial if lift not at bottom
Move syringe to position 1 (max suction)
Rotate carousel to Vial 0 position
Check that a vial is present
Raise vial
Move syringe to position 3 (max blow)
Wait 30 s
Lower vial
Move syringe to position 2 (middle)
NOTE
If all steps appear to succeed, it is probably only a transient problem.
If not, note which step fails. See Autosampler Problems” on page 59 for corrective actions.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies PL-GPC 220 and is the answer not in the manual?

Agilent Technologies PL-GPC 220 Specifications

General IconGeneral
BrandAgilent Technologies
ModelPL-GPC 220
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals