Page 72
EVACU ELITE
INSTALLATION, COMMISSIONING AND USER MANUAL
7 Installation
7.1 Unpacking and inspection
Carefully check packaging prior to unpacking the goods for any external transit damage. Unpack the goods
and check the goods both externally and internally for any loose or damaged components or any other problem
which affects the appearance, installation or operation of the goods.
Ensure all wiring is secure, and all connections are secure, and that all fixings and earth studs are tight.
If any damage has occurred, please contact Ampac in writing within 14 days, as per Ampac’s terms of sale.
7.2 Ant-static precautions
To prevent damage to panel components please ensure prior to touching or handling any of the wiring or PCBs
within the EvacU
ELITE
that you are correctly earthed.
The recommended method is to use an anti-static wrist strap and flexible lead. Fit the wrist strap to yourself
and attached the flexible lead to the cabinet earth bolt located inside the top of the cabinet.
PCBs removed from the EvacU
ELITE
should be immediately placed in an anti-static bag.
7.3 Working on the system
To prevent damage to components please ensure prior to unplugging any connector, connecting or
disconnecting any wiring, removing or replacing any cards in the universal rack that both the mains and
batteries have been isolated. The mains isolator is located in the top left-hand side of the cabinet and the
battery isolator is located adjacent to the batteries.
7.4 Cabinet Installation
The 24U cabinet must be floor mounted. Refer to figures 7-1, 7-2 and 7-3 for cabinet dimensions, fixing points
and cable entry.