Switchgear cabinet
Control room
access door
Control room power
supply cable inlet
Figure 1-12 Froment 8400 load bank - cutaway view showing
major components
Chapter Two
Load Bank Installation and Setup
This chapter covers all of the procedures that need to be carried out before a Froment load bank can
be put into operation. It explains how to install the unit safely and how to commission it to check that it
will operate correctly.
Important!
The chapter contains a number of important safety instructions. Do not attempt to install or operate
your Froment Load bank until you have read and understood this chapter. Misuse could result in serious
injury and damage to the equipment.