EasyManua.ls Logo

Avaya S8700 - Install Rear Panels

Avaya S8700
342 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
122
Installing an Avaya SCC1 Media Gateway Stack
October 2002
Install Rear Panels
1 Install the rear panels and loosely thread each screw. See ‘‘Rear Panel Screw Locations’’
on page 122.
2 For un-stacked media gateways, tighten the screws securely.
For a stack of media gateways, allow the screws labeled callout 4 to remain loose. These
screws are tightened when the ground plates are installed.
3 Be sure the Time Division Multiplexing (TDM) bus cables and the Inter-Cabinet Cables
(ICC) are not pinched by the panels. Also be sure the cables are routed through the
channels provided on the rear panels.
Rear Panel Screw Locations
Figure notes
1 Expansion Control Media Gateway A (No ground plate is installed on an un-stacked
media gateway)
2 Rear Ground Plate (attached between stacked media gateways)
3 Port Media Gateway B
4 Screws to Loosen
2
1
3
4 4
grnd_plt CJL 030696

Table of Contents

Other manuals for Avaya S8700

Related product manuals