141
Cabling Media Gateways
October 2002
Cabling Media Gateways
This section provides both information about installing the telecommunications cabling and
procedures for doing the installation.
Information about Installing the Cabling
‘‘Provisioning Plan’’ on page 143
‘‘Main Distribution Frame (MDF) Hardware’’ on page 144
‘‘MDF Cross-Connect Fields’’ on page 147
‘‘Main Distribution Frame’’ on page 148
‘‘Main Distribution Frame Labels’’ on page 150
‘‘Off-Premises Circuit Protection’’ on page 151
‘‘Cable Installation’’ on page 153
‘‘Sneak Fuse Panels’’ on page 152
‘‘Coupled Bonding Conductor’’ on page 158
‘‘Installation Space Requirements’’ on page 159 for the sneak fuse panels, the 110-type
hardware, and the Cable Slack Manager
‘‘Station Wiring Design’’ on page 160
‘‘Station Circuit Distribution from Equipment Room’’ on page 165
‘‘Layout’’ on page 173
‘‘Patch Cord/Jumper Installation and Administration’’ on page 175