48
925.916.2 - GBINSTRUCTIONS PERTAINING TO THE INSTALLER
13. fIttIngs present In the paCkagIng
• template
• gas cock (2)
• inlet water tap with lter (3)
• heating system delivery cock (1)
• heating system return cock (4)
• washers
• telescopic tubes
• screws and wall plugs
14.
InstallatIon of flue
Figure 8
0301_1008
4321
We guarantee ease and exibility of installation for a gas-red forced draft boiler thanks to the ttings and xtures supplied
(described below).
The boiler is especially designed for connection to an exhaust ue / air ducting, with either coaxial, vertical or horizontal
terminal. By means of a splitting kit a two-pipe system may also be installed.
In case exhaust and intake flues not supplied by BAXI S.p.A. have been installed, these must be certified for the
type of use and must have a maximum pressure drop of 100 Pa.
010828_0200
C
33
C
33
C
13
C
13
C
43
C
53
C
83
Figure 9
Warnings for the following types of installation:
C
13
, C
33
The terminals for the split ue must be provided for within a square
with 50 cm sides. Detailed instructions are given together with
each accessory
C
53
The terminals for combustion air intake and for the expulsion of
combustion products must not be provided for on opposite walls
of the building.
C
6
3
The maximum pressure drop of the ducts must not exceed 100
Pa. The ducts must be certied for the specic use and for a
temperature of over 100°C. The chimney ue must be certied
in accordance with the prEN 1856-1 Regulation.
C
43
, C
83
The chimney or ue used must be suitable for the use.