EasyManua.ls Logo

Binder CB 170 - Water Supply Installation; BINDER Pure Aqua Service (Option)

Binder CB 170
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CB (E7) 06/2018 Page 37/174
4.5.2 Water supply installation
Please proceed in the following order:
1. Fill the freshwater bag with sterilized water.
Observe water quality and temperature (chap. 4.5.1).
As long as no tube is connected to the outlet of the freshwater bag, the bag outlet must be closed
2. Place the freshwater bag with the opening to the left in the recess behind the chamber door.
3. Establish the connection of the tube to the freshwater bag
4. Lead the tube along the pump
5. For operation with humidity, the freshwater bag outlet must be open
4.5.3 BINDER Pure Aqua Service (option)
The optional BINDER water treatment system (disposable system) is available to treat tap water. The
lifetime depends on water quality and the amount of treated water used. The measuring equipment to
assess the water quality is reusable.
For detailed information on operating the water treatment system BINDER Pure Aqua
Service and its function, please refer to the operating manual supplied with BINDER Pure
Aqua Service.

Table of Contents

Related product manuals