EasyManua.ls Logo

Bosch rexroth SE 2/C Series - Assembling the Cross Connector and Foundation Bracket

Bosch rexroth SE 2/C Series
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.6.7 Assembling the cross connector and foundation bracket
Fig. 20:
358 736-28
≤ max 2000 mm
SW24
M = 25 Nm
D
SW17
M = 25 Nm
D
SW13
M = 25 Nm
D
SW13
Ø 8
73
M = 25 Nm
D
3 842 146 815
3 842 526 560
3 842 345 081
AS 2/.. UM 2/..
SZ 2 SZ 2
3 842 528 718
SE 4/R-H-V...
QV 2
3 842 993 052
QV
3 842 994 635
SE 2/R-H...
SE 2/C-H...
SE 2/R...
SE 2/C...
1
2
SW13
M = 25 Nm
D
≤ max 2000 mm
≤ max 2000 mm
b
b
SW13
M = 25 Nm
D
Assembling the cross connector and foundation bracket
1. Install the cross
connectors between the
leg sets.
2. Align the conveyor unit
ush, horizontally and
by height.
3. Secure the conveyor
unit to the fl oor.
For each connection,
you will need:
1x foundation bracket,
3 842 146 815
1x dowel,
3 842 526 560
2x T-bolt, 3 842 528 718
2x fl ange nut,
3 842 345 081
Please note:
Max. distance between
2 cross connectors:
2000 mm.
Assembly 35/108
3 842 358 737/2022-08, MIT: SE 2/C-…, SE 2/R-…, Bosch Rexroth AG
ENGLISH

Table of Contents

Related product manuals