Maintenance and repair 87/108
3 842 358 737/2022-08, MIT: SE 2/C-…, SE 2/R-…, Bosch Rexroth AG
10.4.18 Changing the conveyor chain: AS 2/C-400, …-700, AS 2/R-1200, …-2200,
AS 2/R-V-1200, …-2200 (MA) = R/L
Fig. 70:
358 736-52
4
4
4
M
4x
D
= 7 Nm
SW4
SW10
M
D
= 8 Nm
9
3
X
"X"
M
4x
D
= 7 Nm
SW4
2
1
7
6
5
AS 2/R-... AS 2/R-V-...AS 2/C-...
2
6
8 981 010 510
3 842 539 357
8 981 010 511
M
D
= 2,5 Nm
SW4
3
)
3
)
3
)
Changing the conveyor chain
AS 2/C-…, AS 2/R-…, AS 2/R-V-…
, MA = R/L (1/3)
Please note:
Perform the steps on both
sides in parallel.
Disassembling the chain:
1. Remove the gear motor.
2. Remove the side
cover plates, remove the
bottom cover sheets.
3. Fix the chain tensioner.
4. Open the chain with the
disassembly tool
3
).
3
) Disassembly tool:
– For fl at top chain:
3 842 010 510
– For accumulation roller
chain: 3 842 010 511
– For accumulation
roller chain Vplus:
3 842 539 357
5. Remove the cover of the
return head.
6. Pull the used chain
down from the AS 2/….
7. Remove the sliding piece
from the return head.
8. Remove the return
wheels from the
return head.
ENGLISH