EasyManua.ls Logo

Buchi E-800 - Preparing the Economic Continuous Extraction (Without Chamber Heater)

Buchi E-800
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BÜCHI Labortechnik AG Installation | 5
Operation Manual UniversalExtractor E-800 29/88
u Attach the inert gas connection nuts onto the
extraction glas chamber.
u Connect the inert gas tube.
5.9 Preparing the Economic Continuous Extraction (without chamber
heater)
NOTE
Condenser rack, chamber rack and beaker rack are already installed according to
the ordered method.
For Economic Continuous Extraction use the following positions:
Device Position on the installation board
Beaker rack lower
Chamber rack Nr. 7
Condenser rack Nr. 5
Preparing the instrument
u Switch the On/Off master switch to Off.

Table of Contents