BÜCHI Labortechnik AG Installation | 5
Operation Manual UniversalExtractor E-800 31/88
u Push the chamber rack in the instrument.
5.10 Preparing the Soxhlet Extraction (with and without chamber
heater)
NOTE
Condenser rack, chamber rack and beaker rack are already installed according to
the ordered method.
For Soxhlet Extraction use the following positions:
Device Position on the installation board
Beaker rack lower
Chamber rack Nr. 3
Condenser rack Nr. 1
Preparing the instrument
u Switch the On/Off master switch to Off.
u Attach the condenser rack to the instrument
with screws.
u Prepare the condenser. See Chapter5.17
"Preparing the condenser", page40
u Attach the chamber rack to the instrument with
screws.