EasyManua.ls Logo

Buchi E-800 - Open the Tank Valves; Switch of the Pump; Changing the Membrane with Anchor

Buchi E-800
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BÜCHI Labortechnik AG Cleaning and servicing | 9
Operation Manual UniversalExtractor E-800 73/88
9.3.2 Open the tank valves
Navigation path
[ Service ] [ Actors ]
[ Valves ]
u Navigate to [ Valves ] via the navigation path.
ð The display shows the view Valves.
u Select the position of the tank valve you wish to open.
u Open the tank valve.
u Wait until all solvent is in the tank bottle.
u Close the tank valve.
9.3.3 Switch of the pump
Navigation path
[ Service ] [ Actors ]
u Navigate to [ Actors ] via the navigation path.
ð The display shows the view Actors.
u Disable the action [ Pump ].
9.4 Changing the membrane with anchor
NOTE
Make sure that the spring remains in the valve during the hole changing process.
u Open the screws indicated.
u Remove the level sensor.
u Loosen the screw indicated.
u Remove the valve holder.

Table of Contents