EasyManua.ls Logo

ComAp InteliMains NT IM-NT-BB - Page 277

ComAp InteliMains NT IM-NT-BB
437 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp April 2015
277
11.2.13.13 Setpoint: Ld shedDelay3
Group
Load shedding
Range [units]
0.0 .. 600.0 [s]
Related FW
standard v3.1.0
Force value
possible
YES
Description
This setpoint is used to adjust time period for the load shedding stage 3, that
the control quantity must be above the Ld shedLevel3 limit to close the next
load shedding output.
NOTE:
Learn more about load shedding in the separate chapter Load shedding.
11.2.13.14 Setpoint: Ld reconLevel1
Group
Load shedding
Range [units]
0 .. Ld shedLevel1 [%]
Related FW
standard v3.1.0
Force value
possible
YES
Description
This setpoint is used to adjust the relative load level for load shedding stage
1 (in % of sum of nominal power of running gen-sets or NominMainsImp,
depending on which control quantity is selected) for load reconnection. When
the control quantity drops below this level for more than Ld reconDelay1 time
the next load can be reconnected back.
The appropriate load shedding output is either opened automatically when
the condition above is fulfiled (AutoLd recon = ENABLED) or manually by
activation of the input ManualLdRecon.
NOTE:
Learn more about load shedding in the separate chapter Load shedding.
11.2.13.15 Setpoint: Ld reconLevel2
Group
Load shedding
Range [units]
0 .. Ld shedLevel2 [%]

Table of Contents