EasyManua.ls Logo

Coretec BS Series - Procedures for Installing to Control Panel; Designing Conditions for Control Box; Cautions When Installing BS; The Interval with MR-J3 A

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BS Controller for AC SERVO PRESS
Instruction Manual Ver1.08
BS-M3A-1B
- 20 -
5.
Installation
5.1.
Procedures for installing to control panel
5.1.1.
Designing conditions for control box
Please be advised that the control box meets the general safety specifications.
Take the following into consideration.
1 The control box to house the BS should be a dustproof and drip-proof
structure.
2 Temperature in the control box should be from 0 to 50°C.
Heat generating amount of the BS depends on the operating status of
the Servo press. Install a fan, heat exchanger and heat radiation fin
according to the heat generating amount in the control panel.
3 Make sure to apply sealing to the cable outlet and window portion.
4 Consider mounting of the BS so that maintenance such as inspection and
removal is easily carried out.
5.1.2.
Cautions when installing BS
When installing the main body of the BS, secure space of more than 25 mm (for
cooling) on both sides and more than 80 mm (for removal) above and under the
main body. Moreover, space 100mm or more is required for a front side because
of connectors.
5.1.3.
The interval with MR-J3A
Please make BS controller and MR-J3A adjoin. A connection cable should give
50cm or less as a standard.
5.1.4.
Noise Filter of MR-J3A
Please be sure to insert a line noise filter in AC power supply of MR-J3A.

Table of Contents