3.2.2.1 Hoisting Precautions
Before lifting:
Ensure that the lifting capacity and working radius of the crane meet the requirements. If the onsite working conditions do
not meet the requirements, seek professional evaluation.
For outdoor use, it is recommended to lift the racks when the weather is clear and there is no wind or rain.
Ensure that the crane and steel cable meet the requirements.
Ensure that the door of the rack is closed and locked.
Ensure that the cable connection is safe and reliable.
During lifting:
It is strictly forbidden for unauthorized personnel to enter the lifting area.
It is strictly prohibited for anyone to stand under the lifting arm.
Ensure that the crane is in the proper position (not long-distance hoisting).
Keep the rack steady and the diagonal incline of the rack ≤ 5°.
Hoist gently; lower the cabinets slowly and steadily to avoid impact.
After the rack has made contact with the installation base (e.g., concrete pad), ensure the rack is stably and evenly sitting
atop the base before removing the steel hoisting cable.
Racks must only be hoisted after they are secured.