7-1
7. ENGINE REMOVAL/INSTALLATION
SERVICE INFORMATION
GENERAL SAFETY
•Use a jack to remove or install the engine. Support the motorcycle with a jack firmly, taking precautions not to
damage the frame, engine, cable or harness.
•Attach tape to the frame to protect it during the engine removal or installation.
● Drain the coolant before removing the engine.
● After the engine is installed, fill the cooling system with coolant and be sure to bleed air from the water jacket.
● Start the engine to check for coolant leaks.
TORQUE VALUES :
ENGINE HANGER BOLT (ENGINE) : 4.9㎏f·m
(FRAME) : 3.9㎏f·m
SPECIFICATIONS :
● ENGINE DRY WEIGHT : 30Kg
● ENGINE OIL CAPACITY : 1.1 ( disassembly)
● COOLANT CAPACITY
● TOTAL CAPACITY : 1,400±20cc
● RADIATOR CAPACITY : 1,000±20cc
● RESERVE TANK CAPACITY : 400±20cc
7
SERVICE INFORMATION
··························
7-1
ENGINE REMOVAL
································
7-2
ENGINE INSTALLATION
····························
7-3