Figure 1-15 DC Bus Test Harness Connection Diagram (Closed-Top Soft Start)
3. Connectthetwo(2)plugsoftheDCbustestharnessintotheSoftStart.RefertoFigure1-13SoftStart
(ClosedTop)onpage27.
4. RoutethecablesthroughthecablepassageoneithersideoftheDC-DCConverter,downintothe
serviceside.RefertoFigure1-16CablePassage.
NOTE
l
Forclaritypurposes,severalcomponentshavebeenremovedfromFigure1-16CablePassage
Figure 1-16 Cable Passage
5. CarefullyadjusttheconnectorsandharnesssothattheTopCovercanbereinstalled.
6. Installthetopcovers.RefertoSection4.1CompressorCoversonpage52.
7. RemoveESDstrapfromthecompressorandyourself.
8. ReapplyACpowertotheCompressor.
Page 28 of 294 - M-SV-001-EN Rev. H 1/23/2023