Manual Datafox Evo 4.3 Page 14 Date: 27.12.2017 V 04.03.09.XX
5.1.1. Guidline for Commissioning
5.1.1.1. Set-up of the device
This section provides a short guideline for commissioning und links to the corresponding chapters in
the manual.
► Connecting device to current supply
► Setting interface for communication
► Loading setup of the device See manual „DatafoxStudioIV“
5.1.1.2. Installation of the Device
► Installing the device at the intended location
► Establishing connections for:
o Power:
o Communication:
USB
TCP/IP (HTTP)
TCP/IP wlan
GPRS
RS485
o Digital inputs
o Digital outputs
o Analog inputs
o Access control
► Finishing installation of the device
► Setting for man communication
5.1.1.3. Troubleshooting during Commissioning
► Please see the FAQ on our website: http://www.datafox.de/faq-de.html.
► Tips:
o Connection to the device cannot be set up via TCP/IP
Check IP in the device and the application (studio)
Ping on IP
Setting "Active Connection" in BIOS? set to NO
Setting "HTTP" in BIOS? set to NO