Manual DEHLER 39
52 - 72
4.9 Gas installation
The gas installation of the Dehler 39 for the cooker was installed pursuant to the German
Regulation, Folder G 608 and in compliance with the European Standard EN 10239. The
stamped test certificate is attached to the documentation of the boat.
Components
1. Gas cooker
2. Shut-off valve before the
cooker in the wardrobe
3. CU pipe
4. Pressure adjuster wirh shut-off
valve and gas bottle
5. Camping – GAZ Bottle hollow
Handling of gas installation
Gas installations need to be
handled carefully. Therefore you
should keep to the following
order:
• Open the shut-off valve in the
bottle hollow in the port
cockpit
• Open the valve in the
cupboard for the cooker
Push on one of the burner valves
and light the gas.
FIGURE.: GAS INSTALLATION
• Keep the valve opened, until the pilot flame allows further burning.
LOOK OUT
When switching off, always observe the
following order:
Shut off the cooker burner valve in the
cupboard and the valve in the bottle hollow .
Some additional hints on how to avoid problems with your gas installation:
− Close the valves of the supply pipe and the bottle, when you are not using the ccoking
stove. With emergencies, immediately close the valves.