EasyManua.ls Logo

Dinolift 160XT - Monthly Inspection (Maintenance Inspection)

Default Icon
127 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
74
160XT 180XT 210XT
20.3 MONTHLY INSPECTION (MAINTENANCE INSPECTION)
This inspection shall be performed by a person who is well familiar with the lift.
Task list for the inspection:
- perform the daily inspection measures
- check the attachment points of the boom and the platform
- check the operation and condition of the platform's levelling system
- inspect visually the load-bearing structures
chassis
turning device
telescope (fully extended)
support outriggers and their joints
welded seams for any cracks, corrosion or breaches
have the possible repair welds been properly executed
- check that the platform does not “drift” (refer to the service instructions)
- check that the outriggers do not “drift” (refer to the service instructions).
- check the hydraulic oil level
- check the electro-hydraulic rotary adaptor for oil leaks or seizures
- check the tyres and the tyre pressure
- check the wheel bolts and the rims
- check the turning gear for play
- check the operation of the driving device
- check the condition and attachment of the electric wires
- check the condition and attachment of the battery
- check the condition of the overrun
- make sure that all the signs, warnings and pictorials for the operating controls and
the control equipment are in place, in good condition and clean
- check that the lift is clean all over
Courtesy of Crane.Market

Table of Contents

Related product manuals