72
160XT 180XT 210XT
20 INSPECTION INSTRUCTIONS
All lifting equipment and lifting gear must be inspected in accordance with the national
regulations before using them at a construction site.
Keep a journal of any notable shortcomings and defects observed and advise the
foreman of them.
20.1 FIRST INSPECTION
The initial inspection and test loading of the Dino aerial work platforms is
performed by the manufacturer. A protocol, drawn up during the inspection, will
accompany the lift.
Courtesy of Crane.Market