EasyManua.ls Logo

Dirui CS-T240 - Page 103

Dirui CS-T240
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
103
volume)
38-1 Note
ISE internal
standard
liquid is
inadequate
remaining
volume of
internal
standard
solution is
inadequate
(less then
the user
designed
volume)
1add ISE internal standard solution
2Enter into system maintenance, and
execute "ISE internal standard solution
reagent pipeline rinsing”
3Execute ISE calibration
39-1 Note
ISE diluent is
inadequate
remaining
volume of
diluent is
inadequate
(less then
the user
designed
volume)
1add ISE diluent
2Enter into system maintenance, and
execute "ISE diluent reagent pipeline
rinsing”
3Execute ISE calibration
60-1 Note
ISE LEVEL
error
In the
5-measurin
g point
potential of
internal
standard
solution, the
average
value
(EAV)of
three
potentials is
over the
following
range
internal
standard
solutionK
-90.0mv≤E
AV-10mv
(1) Enter into system maintenance
window, and execute "ISE check."
(2) please refer to " electrolyte device
maintenance " in the "user manual" for
detail.
60-2 Note
ISE LEVEL
error
In the
5-measurin
g point
(1) Enter into system maintenance, and
execute "ISE check."

Table of Contents