When mounting new stirring rod, insert stirring rod till the bottom of motor axis
and tighten it with M2 screw.
Caution
When inserting stirring rod, make sure the
vertical to that of axis of rotating arm. Lateral force may damage the
axis or stirring rod.
Pushing the stirring rod completely
After stirring rod check, visually check whether stirring rod and its rotating arm
are vertical with each other.
If not vertical, return to step 5 and remount the stirring rod.
If vertical, continue to next.
Lift the rotating arm of stirring rod by hands to its top position, and rotate its
rotating arm to the top of its rinsing bath.
Caution
Please make sure to rotate stirring rod to its rinsing bath top after
Switch on the power of analysis part and wait 30 seconds, enter the
routine maintenance" column to implement “instrument
resetting", the system will automatically reset the sample&reagent probe and
rinse it with deionized water. Observe the outflow of reagent&sample probe.
7.8.6 Check reaction cuvette
Warning:
Please be careful to avoid being scratched by sample&reagent probe.
Place each probe and pole into proper position for convenience.
Biological contamination danger:
In operation, please put on gloves, work cloths, and put on protective glasses
for the best
Please deal with removed reaction cuvette properly which is broken.
Caution:
Please
use consumables recommended by DIRUI company, using other
consumables may cause system performance degradation.
Make sure the analysis part power is switched off.