Maintenance - 2000h
4812160801_D.pdf 2018-12-17
Hydraulic reservoir - fluid change
Fig. Hydraulic reservoir
1. Draining
1
Use an external drainage pump when
draining/emptying the hydraulic reservoir.
Risk of burn injuries when draining hot oil. Wear
protective gloves and goggles.
Risk of burn injuries when draining hot oil. Wear
protective gloves and goggles.
Unscrew the tank cap. Place the pump's suction hose
in the filler/drain outlet in the hydraulic tank. Place the
other hose in a container.
Use a receptacle that holds at least 15 liters (4
gal).
Use a receptacle that holds at least 15 liters (4
gal).
Start the pumpen so that it sucks out the fluid from the
tank.
Check that the hose to the pump reaches the bottom
of the hydraulic reservoir to ensure that as much of the
fluid as possible is drained.
Collect the oil and deliver to special waste
handling.
Collect the oil and deliver to special waste
handling.
Fill up with the recommended hydraulic fluid to the
correct level. Replace the cap on the tank and wipe
clean.
Change the hydraulic fluid filter, see under heading
'Every 1000 hours of operation'.
Start the engine and operate the various hydraulic
functions. Check the level in the reservoir and top off
as required.
104

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dynapac CC1000 and is the answer not in the manual?

Dynapac CC1000 Specifications

General IconGeneral
BrandDynapac
ModelCC1000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals