Chapter 4 UPS SYSTEM INSTALLATION
This chapter will present mechanical installation and cable installation of the UPS. The cables connecting the
UPS and AC mains shall be provided by customers.
The installation inspection and initial startup of the UPS shall be carried out by Eaton customer service
engineers. Battery cabinets can be performed by qualied service personnel of the equipment manufacturer or
agent.
4.1. Preliminary Installation Information
WARNING
Failure to observe the instructions in this operating manual may cause risk of injury to personnel
or damage to the UPS and load equipment.
Refer to the following when installing the UPS system:
• Please read
Chapter 3
for the cabinet dimensions, equipment weight, wiring and terminal data as well
as installation related matters.
• The tilting angle shall not be greater than ±10° when installing the cabinet.
• If perforated oor tiles are required for ventilation, place them in front of the UPS.
4.2. UPS Cabinet Inspection and Unpacking
For the UPS system to operate at peak efciency, the installation site shall meet the environmental
parameters outlined in this manual. The operating environment must meet weight, cleanliness and specic
environmental requirements.
WARNING
• The UPS cabinet is very heavy. See
Table 3-1
for the weight information. If the loading and
unloading instructions are not strictly followed, the cabinet may fall and cause serious
personal injury.
• Do not stand in front of the pallet when unloading the cabinet. If the unloading instructions are
not strictly followed, the cabinet may cause serious personal injury.
1. Carefully inspect the outer package for obvious damage during handling. Check whether the "tilt
indication label" on the outer box of the equipment is in normal condition. Stop operation if you nd