Eaton 93PR 15-80 kW UPS
Installation and Operation Manual
32
Copyright © 2022 Eaton Corporation plc. All rights reserved.
1. Pry open the metal
connecting members.
5. Lay the slope board in
front of the pallet.
2. Remove the wooden box
3. Remove the cushioning materials
4. Remove the screws
xing the equipment
and the retaining rack
at the bottom
6. Remove the retaining rack at the
bottom of the equipment. At last,
slowly slide the equipment onto the
ground along the slope board
Figure 4-2: 60–80k unpacking diagram