Maintenance
151
Pos: 13.1 /0 020 Über sc hrif ten /ELT RA 1. Ü bers chr ift en/ 1 Mai nt ena nce E LTR A @ 6\ mod_1373443420293_9.docx @ 43351 @ 212232222 @ 1
7 Maintenance
Pos: 13.2 /0 010 ELTR A/ 0015 s ervic e_i nstr uc tio ns/C S-800 _Ser vic e/00 35 M aint e nace/ 350 5 M odul M ainte nac e @ 7\mod_1382429660977_9.docx @ 50042 @ 3223322233333433433 @ 1
– Check the IR cell base lines.
See chapter Check base lines
– Clean the paths if necessary.
See chapter IR paths cleaning and replacing. If so, readjust.
See chapter Infrared base line adjustments.
– Check the metal dust filter. Clean it or if necessary, replace it.
See chapter Fluctuating gas flow,
See chapter High carbon results are erratic and
See chapter Furrnace – large collection of dust when opening.
– Check the flow.
See chapter Gas flow controller.
– Carry out leakage test.
– Check the chopper purging. The flow rate should be around 10 L/h.
– Test the power of the induction furnace by burning samples. If the
combustion and the fusion in the crucible show weak combustion, then
replace the oscillator tube.
See also chapter Induction generator control.
– Test the pneumatics and if necessary readjust.
See Chapter Pneumatics.
=== Ende der Lis te f ür T e xtmar ke I nhal t == =