EasyManua.ls Logo

Endress+Hauser Proline Promag 55 - Commissioning; Function check; Switching on the measuring device

Endress+Hauser Proline Promag 55
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Proline Promag 55 PROFIBUS DP/PA Commissioning
Endress+Hauser 73
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you start up your measuring point:
Checklist for "Post-installation check" ä 35
Checklist for "Post-connection check" ä 55
!
Note!
When using PROFIBUS PA, please note the following:
The PROFIBUS interface's technical data must be maintained in accordance with IEC 61158-2
(MBP).
A normal multimeter can be used to check the bus voltage of 9 to 32 V and the current
consumption of 11 mA at the device.
6.2 Switching on the measuring device
Once the connection checks have been successfully completed, it is time to switch on the power
supply. The device is now operational.
The measuring device performs a number of post switch-on self-tests. As this procedure progresses
the following sequence of messages appears on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an error message indicating the cause is displayed.
Messages: PROFIBUS DP Messages: PROFIBUS PA
PROMAG 55
START-UP
RUNNING
Startup message
PROMAG 55
START-UP
RUNNING
PROMAG 55
DEVICE SOFTWARE
V XX.XX.XX
Display of current
Software
PROMAG 55
DEVICE SOFTWARE
V XX.XX.XX
PROFIBUS DP
RELAY OUTPUT 1
RELAY OUTPUT 2
STATUS INPUT 1
Existing input/output modules
Input/output modules
PROFIBUS PA
SYSTEM OK
OPERATION
Beginning of normal measuring mode
Operation
SYSTEM OK
OPERATION

Table of Contents

Other manuals for Endress+Hauser Proline Promag 55

Related product manuals