EasyManua.ls Logo

Epson RC90 - Page 116

Epson RC90
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. General Maintenance
Safety and Installation (RC90 / EPSON RC+ 7.0) Rev.5
100
For the parts subject to overhaul, refer to Manipulator manual: Maintenance
section: Maintenance Parts List.
For details of replacement of each part, refer to the Manipulator manual:
Maintenance section.
Please contact our service center or distributors of your region for further
information.
CAUTION
Overhaul timing is based on an assumption that all joints are
operated f
or equal distance. If a particular joint has a high duty or
high load, it is recommended to overhaul all joints (as many as
possible) before exceeding 20,000 operation hours with the joint as
a basis.

Table of Contents

Other manuals for Epson RC90

Related product manuals