EasyManua.ls Logo

Epson RC90 - 5 General Maintenance; Schedule for Maintenance Inspection; Manipulator

Epson RC90
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. General Maintenance
Safety and Installation (RC90 / EPSON RC+ 7.0) Rev.5
95
5. General Maintenance
This chapter describes maintenance inspections and procedures. Performing
maintenance inspections and procedures properly is essential for preventing
trouble and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
5.1 Schedule for Maintenance Inspection
5.1.1 Manipulator
Inspection points are divided into five stages: daily, monthly, quarterly, biannual,
and annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection
points must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours
operation.
Inspection Point
Daily
Monthly
Quarterly
Biannual
Annual
Overhaul
1 month
(250 h)
Inspect every day
2 months
(500 h)
3 months
(750 h)
4 months
(1000 h)
5 months
(1250 h)
6 months
(1500 h)
7 months
(1750 h)
8 months
(2000 h)
9 months
(2250 h)
10 months
(2500 h)
11 months
(2750 h)
12 months
(3000 h)
13 months
(3250 h)
20,000 h
h = hour

Table of Contents

Other manuals for Epson RC90

Related product manuals