4.1 Commissioning – Testing the valves
PLEASE NOTE
Before commissioning the CP valve terminal,
observe the specifications on medium, see chapter
"Installation", section 3.2.1 Auxiliary pilot air.
Commissioning of the CP valve terminal should be un-
dertaken as follows:
Commissioning variants Activity
Preliminary test of the
pneumatic tubing
Test the valve-cylinder
combination with the manual
override.
Complete commissioning of the
complete system
Install and connect the complete
system.
Program control by PLC/
industrial PC.
There now follows a description of how to commission
the pneumatic components with the manual override.
Commissioning the CP system is described in the ap-
propriate manual for the CP node.
4. Commissioning
CPV... 9802 4-3