2.1.3 Fitting with feet
PLEASE NOTE
In order to fit the CP valve terminal with feet (at the
level of work connections 2 and 4) you require the
following fastening screws:
•
4 M4 x 45 socket head screws (CPV10)
•
4 M4 x 50 socket head screws (CPV14)
•
4 M6 x 65 socket headscrews (CPV18)
Proceed as follows:
• First you must prepare your fastening surface, and
make a suitable bracket where necessary. The posi-
tion and distances between the fastening holes of the
CP terminals are shown in the diagram below.
CPV 10 terminal CPV 14 terminal CPV 18 terminal
1
2
3
53 mm
4 mm
10 mm x number
of plates
66 mm
5 mm
14 mm x number
of plates
87 mm
8.1 mm
18 mm x number
of plates
Fig. 2/3: Position of the fastening holes