Maintenance Instructions
Seite/Page 126 Panda PMS 8.000 NE - 42 NE Manual.R05 - Kapitel/Chapter 6: Maintenance Instructions 22.3.11
Fig. 6.10.2-34: Screw in the ventilation screw
Screw in the ventialtion screw and tighten it (Tool: Allen
wrench SW6 - 20 Nm).
Remove the start interlock.
Re-connect the starter battery.
Run the generator for 3-5 minutes.
Check the oil level, if necessary refill/ discharge some oil.
Mount the capsule.