Further information
Further information about the cooling coil can be found in the separate data sheet and the list
of equipment in the complete documentation for the gear unit.
Further information about connection dimensions and cooling water parameters can be found
in the gear unit dimensional drawing in the complete documentation for the gear unit.
Further information about the required cooling water 󹪞ow rate and the maximum permissible
inlet temperature can be found in the data sheet and the list of equipment in the complete
documentation for the gear unit.
6.2 Measures during commissioning
Please observe the following measures to commission the gear unit and document these:
Check the oil level.
Measure the oil sump temperature (Page 104) after the gear unit has run in.
Check that the shaft seal on the gear unit does not leak.
Check that no contact with rotating parts is possible.
Check whether the shuto󹪜 valves are open.
Check that all of the oil drain valves are closed.
Ensure that all of the other shuto󹪜 valves are open.
Check all the connection lines are securely tightened and leak-free.
For gear units with bearing monitoring by measuring the vibration: Measure the vibration
levels of the rolling-contact bearings (Page 107) to create initial and comparison values.
When commissioning, the pressure monitor signal should be bypassed for approximately 20
seconds. This is necessary as the pressure in the gear unit must 󹪝rst stabilise.
Further information
You can 󹪝nd additional information on the topic of oil in the operating instructions BA 7300,
provided in the complete gear unit documentation.
Further information about the oil supply system can be found in the oil supply system operating
instructions in the complete documentation for the gear unit.
6.2.1 Heating
Please observe the following measures to commission the gear unit with heating:
Ensure that the heating elements are not exposed.
Check the switching points of the temperature monitor.
Commissioning
6.2 Measures during commissioning
Assembly and operating instructions A5051en
Edition 06/2020 97