Index
A
Air-oil cooler
Principle of operation, 30
Alignment
Alignment surface, 56
Prealignment, 56
Attachment points, 51
Auxiliary drive
Checking, 97
Commissioning, 84
Filling the overrunning clutch with oil, 97
B
Backstop
Commissioning, 84
Design, 35
filling with oil, 95
Principle of operation, 34
replacing, 95
Bearing monitoring
Acceleration sensor, 40
Resistance thermometer, 39
C
Check that the
fastening bolts are tight, 98
Coloured markings, 14
Contact, 105
Cooling, 28
Cooling coil
Commissioning, 83
Connecting, 73
Principle of operation, 29
Copyright, 12
Coupling, 35
Customer Services, 105
D
Danger of explosion, 18
Directions of rotation, 21
Disclaimer, 11
Disposal, 107
Documentation landscape, 11
E
Environmental protection, 107
Equipment features, 22
Eye bolts, 47
F
Fan
Air guide cover, 28
Principle of operation, 28
Fastening bolts
Bolt connection class, 78
Bolts, 77
Mating threads, 78
Preload force, 79
Tightening procedure, 78
Tightening torque, 79
Fault, 99
Fault rectification, 100
Filter, 33
Final work, 80
G
Gear unit designs, 21
Gear unit equipment, 23
Gear unit housing, 22
Gear unit markings, 14
General inspection of the gear unit, 99
H
Heating
Commissioning, 87
Connecting the heating element, 77
Function, 36
Heating elements, 36
Temperature monitor, 37
I
Interval, 92
Irregularities in operation, 89
REDUREX Gear unit 5200en
Operating Instructions 03/2019 123

Table of Contents