contact@webdyn.com | webdyn.com
V2.05 subject to changes | Webdyn © by Flexitron Group
2. Installation and Maintenance
2.1 Prerequisite
As the WebdynSunPM concentrator’s role is to send the data it collects to an IS, installation requires
knowledge of the concentrator but also of the IS it will upload its data to.
The following elements are required to guarantee a proper installation:
• To have this user manual to hand.
• To have a screwdriver suitable for the connector types available on the WebdynSunPM.
• To have knowledge of the parameters to connect to the IS information system.
It is also strongly recommended to have the elements described below for any intervention on site and
to install the product.
• To have a SIM card with an activated M2M subscription (data and text messages (optional))
and knowledge of the supplier’s APN. The SIM card call number can be useful.
• Use a remote antenna if radio or cellular modem reception is deteriorated.
• To have a PC for the product conguration or update using the concentrator’s Web interface.
2.2 Unpacking
2.2.1 Content
The standard version of the WebdynSunPM concentrator is delivered with:
• An angled SMA antenna for the modem (taped to the back of the product).
• A battery (already in place in the product).
2.2.2 Identication
The commercial reference is composed as follows:
• WG0517-A01: WebdynSunPM Europe and India version
• WG0517-A02: WebdynSunPM in Monde version
• WG0517-A03-DEIE: WebdynSunPM in Europe and India version in a DEIE box
• WG0517-A04: WebdynSunPM 4G in Europe and India version