EasyManua.ls Logo

Fraco SEP-5000 - 6 Transport; Inspection Upon Delivery; Loading and Unloading of the Machine; Lifting with a Forklift

Fraco SEP-5000
89 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport platform SEP Serie
SEP user’s manual Page 38 of 89 Doc no. RD-7243-MA-001-02
6. Transport
The platform must be transported by experimented and competent persons.
6.1. Inspection upon delivery
Inspect the shipment for any transport related damages and to validate that all necessary
pieces were shipped with your order.
Immediately advise the transport company and the seller in case of damages or missing
pieces.
6.2. Loading and unloading of the machine
The sections/components of the machine are loaded and unloaded with the help of a forklift
or a crane.
6.2.1. Lifting with a forklift
The forklift lifting points (1) are located on the base supports of the platform.
WARNING, the forklift forks must be the appropriate length or corresponding base supports
must be provided.
(1)
Figure 21 Lifting with a forklift
(1)

Table of Contents