SEP user’s manual Page 70 of 89 Doc no. RD-7243-MA-001-02
9.3. Monthly maintenance
• In addition to the daily and weekly inspection elements, consider the following elements:
• Check that every bolt of the mast, individual mast sections and end of mast section, of
the base, of the travel en detectors, of the floor runners, of the centrifugal emergency
brake, of the mast attachments and building anchors are tightened and safe. Tighten
bolts according to the tightening torque guidelines as needed.
• Inspect alignment of the rack.
• Check the wear of the pinions, planetary gears and on the segments of the rack. Check
with the 0,55" (14 mm) rectified stem. Replace parts as needed.
• Lubricate the centrifugal emergency brake through the four (4) lubrication points.
9.4. Quarterly maintenance
• Perform the drop test by following the present manual instructions. This test is required
periodically by safecty standards and it is possible that effective local laws and
regulations require that this test be performed more frequently.
∞ SEE SECTION 10.1 DROP TEST PROCEDURE, ON PAGE 75.
• Inspect the condition of all data plates, stickers and warnings present on the platform. All
data plates and stickers must be legible and in good condition. Replace as needed.
∞ SEE SECTION 4.10 DATA PLATES AND STICKERS, ON PAGE 31.
• Check the level of the lubricant tank (tank is optional).
o The necessary quantity of lubricant necessary for 120h of normal operation is 1,2L.
o Fill the lubricant tank before it empties.
To fill the tank, connect the lubricating pistol to the filling connector. Fill the tank until
the lubricant reaches the MAX level.
WARNING! Lubricants with solid components are not adapted to this pump.