EasyManua.ls Logo

Fraco SEP-5000 - Interruption And;Or End of Work

Fraco SEP-5000
89 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport platform SEP Serie
SEP user’s manual Page 49 of 89 Doc no. RD-7243-MA-001-02
7.8.4. Interruption and/or end of work
Lower the platform to the loading dock and unload it of all material.
REFER TO SECTION 7.8.3 DESCEND, ON PAGE 48.
Turn the key switch of the (CC1) panel to the "ARRÊT/OFF" position.
If necessary, remove the key and/or position the selector to "ARRÊT/OFF" (refer to effective
local standards and regulation.
Note: it is not necessary to turn off the main switches (480V) unless otherwise mentioned.
Heating elements are present to warm the electric pieces at all time. This is most useful during
winter of in cold climates.

Table of Contents